Lakeport Brewing L.P.
Hamilton, Ontario
2006/2007
New Canning Line Installation
Heavy Reinforced Slab Including Stainless Steel Trench Drain System
Thermal Lagering Tank Farm Addition
Reinforced concrete structure on piles to support beer storage tanks
Project Team:
Project Manager - Ron Worrall/Chris Wills
Site Superintendent - Bob Dalton
Estimator - Kim McCarthy
Cost of Construction:
$1,100,000
Consultants:
Atkinson Engineering Inc.
Owner:
Lakeport Brewing L.P.
|